Solar Array
Manufacturing- Orbital energy generation.
- Unit types:
'Advanced',
'Orbital',
'EnergyProduction',
'Economy',
'Mobile',
'FactoryBuild',
- HP: 2500
- Build cost: 2800 metal
- HP per 1 Metal: 0.8929
- Infrastructure cost per 1 metal production(Basic Energy Plant): 100.5
- Infrastructure cost per 1 metal production(Advanced Energy Plant): 93.4
- Minimum assisted infrastructure cost per 1 metal production(Basic Energy Plant): 39.4
- Minimum assisted infrastructure cost per 1 metal production(Advanced Energy Plant): 38.5
-
Match-up table
Solar Array
-
Match-up table listed by effectiveness
Solar Array
Physics:
- Max speed: 10
- Acceleration: 45
- Braking rate: 10
- Turn rate: 45
Recon:
Economy:
- Energy production: 4000 / s
-
Built by: